- WBC Contracting logging truck being loaded in the Talchacko valley.
- Mechanized felling machine working in second growth stand in the Talchacko valley.
- Pre-harvest timber reconnaisance
- Got Wood’s mini tower and crew L-R: Korbyn Dunn, Lester Edgar, Leonard Dorsey, Duncan Bittner (2013)
- Minitower at work in fall of 2013.
- WCB Contracting getting a load in the Salloompt in 2013.
- Logging truck being unloaded at the dry land sort (2013)
- Directors Roger Brandt and Ed Willson inspect the logs from the Salloompt in spring 2013.
- Faller David Kopas on freshly felled log in the Talchacko (2013).
- Faller Kevin Matuga watching Douglas-fir begin to tip over (2013).
- Korbyn Dunn measuring diameter of a fire scarred Douglas-fir.
- Bettor Enterprises loading logging truck in winter (2013).
- Logs are bucked and trimmed to precise specifications prior to loading on a truck.
- Faller
- Heli Logging
- Forest Road Engineering
- Log Barge